Citation: | ZHANG Ruibin, XI Daoguo, WANG Leyang, HUANG Jinxin, ZHANG Qiang. Effect of A/O+ aluminum sludge filled constructed wetland combined process on rural domestic sewage[J]. Journal of Environmental Engineering Technology, 2019, 9(2): 145-150. doi: 10.12153/j.issn.1674-991X.2018.11.270 |
[1] |
袁忠顺 . 农村生活污水A/O-人工湿地处理工艺参数的优化与湿地植物的筛选[D]. 南京:南京农业大学, 2014.
|
[2] |
吴乘飚 . A/O-潜流人工湿地工艺处理农村生活污水[J]. 资源节约与环保, 2016(9):300-301.
doi: 10.3969/j.issn.1673-2251.2016.09.242 |
[3] |
CASELLES-OSORIO A , GARCÍA J . Performance of experimental horizontal subsurface flow constructed wetlands fed with dissolved or particulate organic matter[J]. Water Research, 2006,40(19):3603-3611.
doi: 10.1016/j.watres.2006.05.038 pmid: 16872658 |
[4] |
VYMAZAL J, GREENWAY M, TONDERSKI K , et al. Constructed wetlands for wastewater treatment[M] //Wetlands and Natural Resource Management.Heidelberg: Springer Berlin Heidelberg, 2006: 69-96.
|
[5] |
宋小康, 金龙, 王建芳 , 等. ABR+复合人工湿地处理农村生活污水中试[J]. 环境工程, 2011,29(3):6-9.
SONG X K, JING L, WANG J F , et al. Pilot test on treating rural domestic wastewater by process of ABR+combined constructed wetland[J]. Environmental Engineering, 2011,29(3):6-9.
|
[6] |
李晓东 . A/O及人工湿地耦合工艺处理县城生活污水[J].环境保护与循环经济, 2012(9):54-55.
doi: 10.3969/j.issn.1674-1021.2012.09.016 |
[7] |
王荣, 贺锋, 徐栋 , 等. 人工湿地基质除磷机理及影响因素研究[J]. 环境科学与技术, 2010,33(增刊1):12-18.
WANG R, HE F, XU D , et al. The Study on the mechanisms and influencing factors of substrates in constructed wetlands removing phosphorus[J]. Environmental Science and Technology, 2010,33(Suppl 1):12-18.
|
[8] |
钟成华, 李杰, 邓春光 . 人工湿地废水处理中氮、磷去除机理研究[J]. 土木建筑与环境工程, 2008,30(4):141-146.
ZHONG C H, LI J, DENG C G . Advances in the study of nitrogen and phosphorus removal mechanisms in constructed wetlands[J]. Civil and Environmental Engineering, 2008,30(4):141-146.
|
[9] |
辛杰, 裴元生, 王颖 , 等. 几种吸附材料对磷吸附性能的对比研究[J]. 环境工程, 2011,29(4):30-34.
XIN J, PEI Y S, WANG Y , et al. Contrastive study on phosphorus adsorption of several adsorbents[J]. Environmental Engineering, 2011,29(4):30-34.
|
[10] |
万正芬, 张学庆, 卢少勇 . 19种人工湿地填料对磷吸附解吸效果研究[J]. 水处理技术, 2015,41(4):35-40.
WAN Z F, ZHANG X Q, LU S Y , The adsorption and desorption of phosphorus by nineteen constructed wetland substrates[J]. Technology of Water Treatment, 2015,41(4):35-40.
|
[11] |
胡沅胜, 赵亚乾 , AKINTUNDE B, 等. 铝污泥基质潮汐流人工湿地强化除污中试[J]. 中国给水排水, 2015(13):116-122.
HU Y S, ZHAO Y Q, AKINTUNDE B , et al. Pilot study on enhanced pollutants removal in alum sludge-based tidal flow constructed wetlands [J]. China Water & Wastewater, 2015(13):116-122.
|
[12] |
操家顺, 朱文杰, 李超 , 等. 给水厂污泥作为人工湿地滤料对磷的去除效果研究[J]. 环境科技, 2015,28(5):16-20.
CAO J S, ZHU W J, LI C , et al. The research of phosphate removal by using water treatment residuals as filter materials in constructed wetlands[J]. Environmental Science and Technology, 2015,28(5):16-20.
|
[13] |
江萍, 黎俊, 张文涛 , 等. 生物接触氧化法处理有机废水的进展[J]. 环境与开发, 2000,15(4):6-28.
JIANG P, LI J, ZHANG W T , et al. The progress of organic wastewater treatment by biological contact oxidation process[J]. Environment and Development, 2000,15(4):6-28.
|
[14] |
DRIZO A, FROST C A, GRACE J , et al. Physico-chemical screening of phosphate removing substrates for use in constructed wetland systems[J]. Water Research, 1999,33(17):3595-3602.
doi: 10.1016/S0043-1354(99)00082-2 |
[15] |
BABATUNDE A O, ZHAO Y Q . Constructive approaches toward water treatment works sludge management: an international review of beneficial reuses[J]. Critical Reviews in Environmental Science & Technology, 2007,37(2):129-164.
doi: 10.1080/10643380600776239 |
[16] |
李红梅, 陶高峰, 徐凌 , 等. 植物功能群多样性对人工湿地微生物生物量和营养滞留的影响[J]. 植物营养与肥料学报, 2011,17(6):1365-1371.
LI H M, TAO G F, XU L , et al. Effects of plant functional group diversity on microbial biomass and nutrient retention in a constructed wetland[J]. Plant Nutrition and Fertilizer Science, 2011,17(6):1365-1371.
|
[17] |
张瑞斌 . 不同水生植物对污水处理厂尾水的生态净化效果分析[J]. 环境工程技术学报, 2015,5(6):504-508.
ZHANG R B . Ecological purification efficiency of several aquatic plants on tail water of sewage treatment plant[J]. Journal of Environmental Engineering Technology, 2015,5(6):504-508.
|
[18] |
谢娇, 鲍建国, 易振辉 . 人工湿地植物特性的研究及植物配置分析 [J].化学工程与装备, 2011(4):164-166.
doi: 10.3969/j.issn.1003-0735.2011.04.062 |
[19] |
国家环境保护总局. 城镇污水处理厂污染物排放标准: GB 18918—2002[S]. 北京: 中国标准出版社, 2002.
|
[20] |
REDDY K R . Oxygen transport through aquatic macrophytes[J]. Journal of Environmental Quality, 1989,19(2):261-267.
|
[21] |
BRIX H . Do macrophytes play a role in constructed treatment wetlands[J]. Water Research, 1997,35(5):11-17.
doi: 10.1016/S0273-1223(97)00047-4 |
[22] |
SCHOLZ M, XU J . Comparison of constructed reed beds with different filter media and macrophytes treating urban stream water contaminated with lead and copper[J]. Ecological Engineering, 2002,18(3):385-390.
doi: 10.1016/S0925-8574(01)00100-8 |
[23] |
张文娟 . 人工湿地除磷基质研究及同步脱氮除磷填料的开发[D]. 重庆:西南大学, 2011.
|
[24] |
BRIX H . Functions of macrophytes in constructed wetlands[J]. Water Science & Technology, 1994,29(1/2):37-42.
|
[25] |
高翔, 张先斌 . A 2/O生物膜与人工湿地处理村落污水中试研究 [J]. 科学技术与工程, 2011,11(21):5120-5123.
doi: 10.3969/j.issn.1671-1815.2011.21.035 |
[26] |
SUN G, ZHAO Y, ALLEN S . Enhanced removal of organic matter and ammonia-nitrogen in a column experiment of tidal flow constructed wetland system[J]. Journal of Biotechnology, 2005,115(2):189-197.
doi: 10.1016/j.jbiotec.2004.08.009 pmid: 15607237 |
[27] |
王拯, 张红涛 . 间歇流人工湿地处理农村生活污水的研究[J]. 兰州交通大学学报, 2011,30(4):111-115.
WANG Z , ZHANG H T . Batch-flow constructed wetland for rural wastewater treatment[J].Journal of Lanzhou Jiaotong University, 2011, 30(4):111-115.
|