Volume 7 Issue 6
Nov.  2017
Turn off MathJax
Article Contents
ZHANG Yifan, LEI Kun, DENG Yixiang, LI Zicheng, QIAO Fei, YAN Mengjiao. Determination of discharge permit limits for indirect discharge enterprises with equivalent mass method: a case study in Changzhou City[J]. Journal of Environmental Engineering Technology, 2017, 7(6): 754-758. doi: 10.3969/j.issn.1674-991X.2017.06.104
Citation: ZHANG Yifan, LEI Kun, DENG Yixiang, LI Zicheng, QIAO Fei, YAN Mengjiao. Determination of discharge permit limits for indirect discharge enterprises with equivalent mass method: a case study in Changzhou City[J]. Journal of Environmental Engineering Technology, 2017, 7(6): 754-758. doi: 10.3969/j.issn.1674-991X.2017.06.104

Determination of discharge permit limits for indirect discharge enterprises with equivalent mass method: a case study in Changzhou City

doi: 10.3969/j.issn.1674-991X.2017.06.104
More Information
  • Corresponding author: Kun LEI E-mail: leikun99@163.com
  • Received Date: 2017-05-22
  • Publish Date: 2017-11-20
  • The discharge permit system is an important means to control the total pollutant load and improve the watershed environmental quality. The indirect discharge enterprises (IDEs) are also included in the discharge permit system. It is a difficult problem on how to determine the discharge permit limit (DPL) for the IDEs, and there is no such a uniform regulation at the national level at present. By referring to the NPDES of the United States, the Equivalent Mass Method (EMM) was formulated to estimate the DPL for the IDEs. The EMM was successfully used to estimate the DPL for six IDEs, which were located in Changzhou City, Jiangsu Province and with the wastewater being discharged into one wastewater treatment plant. The EMM was used to calculate the equivalent mass load limits for the 6 enterprises and, in combination with the current discharge concentration standards, the CODCr DPLs were determined. Thus, the EMM is an effective method to estimate the discharge permit limits for the IDEs, and can be applied flexibly to the enterprises with different discharge characteristics, including newly built enterprises discharging into the pipeline network, existing enterprises stopping to discharge into the pipeline network, and under the circumstance of enhancing the discharge standards, etc.

     

  • loading
  • [1]
    刘炳江 . 改革排污许可制度落实企业环保责任[J].聚焦, 2014(14):14-16.

    LIU B J . Reform the emission permit system and achieve the corporate responsibility for environmental protection[J].Focus, 2014(14):14-16.
    [2]
    孙佑海 . 如何完善落实排污许可制度[J].环境保护, 2014(14):16-17.

    SUN Y H . How to improve and implement the pollution discharge license system[J].Environmental Protection, 2014(14):16-17.
    [3]
    US EPA . Federal water pollution control act[R]. Washington DC:US EPA, 2002.
    [4]
    US EPA . Guidance manual for the use of production-based pretreatment standards and the combinde wastestream formula[R].Washington DC:US EPA. Permits Division and Industrial Technology Division, 1985.
    [5]
    US EPA . NPDES permit writers’ manual[R].Washington DC:US EPA. Office of Water, 2010.
    [6]
    US EPA . NPDES pretreatment local limits additional information[R]. Washington DC:US EPA, 2005.
    [7]
    US EPA . Pretreatment standards and requirements[R]. Washington DC:US EPA, 1998.
    [8]
    谢林伸, 刘擎 . 南方某市纳管工业企业废水污染物排放标准执行研究[J].江苏科技信息, 2014(24):67-68.
    [9]
    孙海林, 李巨峰, 朱媛媛 . 我国水质在线监测系统的发展与展望[J]. 中国环保产业, 2009,3(12):12-16.
    [10]
    US EPA . Technical guidance manual for developing total maximum daily loads[R].Washington DC:US EPA. Office of Water, 1997.
    [11]
    陆树立 . 我国污染源在线监控系统建设运行及对策措施研究[J]. 环境研究与监测, 2009,1(7):7-8.
    [12]
    王淑一, 雷坤, 邓义祥 , 等. 基于不同时间周期的排污许可限值[J]. 环境科学研究, 2016,29(1):182-184.

    WANG S Y, LEI K, DENG Y X , et al. Discharge permit limits based on different temporal periods[J]. Research of Environmental Sciences, 2016,29(1):182-184.
    [13]
    常州市统计局. 2015 年常州市国民经济和社会发展统计公报[EB/OL].(2016-03-03)..
    [14]
    常州市水利局. 2015 年度常州市水资源公报[EB/OL].( 2016-10-26). .
    [15]
    US EPA . Local limits development guidance[R].Washington DC:US EPA. Office of Wastewater Management, 2004.
    [16]
    US EPA . Introduction to national pretreatment program[R].Washington DC:US EPA. Office of Wastewater Management, 2011.
    [17]
    US EPA . General pretreatment regulations for existing and new sources of pollution,40 CFR403[R].Washington DC:US EPA. Office of Wastewater Management, 1987.
    [18]
    US EPA . Development document for effluent limitations guidelines and standards for the organic chemicals,plastics and synthetic fibers point source category [R].Washington DC:US EPA.Office of Wastewater, 1987.
    [19]
    US EPA . Development document for final effluent limitations guidelines and standards for the pharmaceutical manufacturing point source category [R].Washington DC:US EPA.Office of Wastewater, 1988.
    [20]
    环境保护部. 工业源产排污系数手册(2010修订)上册[M]. 北京:环境保护部, 2010: 402-413.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article Views(429) PDF Downloads(545) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return