辽河保护区河道防洪能力提升工程研究

Research on Flood Control Capacity Improvement Engineering for Liaohe Conservation Area

  • 摘要: 针对辽河河道泥沙淤积严重而导致的河床主槽升高、防洪能力降低以及汛期洪水威胁堤防等问题,提出了河道清淤疏浚综合整治工程技术和方案。通过对辽河重点河段清淤范围的划定,对柳河口-卡力马-六间房-盘山闸-曙光桥以及石佛寺坝前-鲁家大桥段5个河段的清淤断面进行了设计,采用设计横断面与现状横断面套绘的方法对清淤量进行了核算,河道清淤总长度达194.79 km,清淤量为6 373.13 万m3。对辽河干流岸坡生态治理进行了设计,设计岸线总长度1 064 km,建设工程总长度625.6 km,最终达到辽河河势稳定、消除险工的河道综合治理的目的。

     

    Abstract: Against the problems of siltation caused Liaohe River main channel rising, flood control ability decreasing, and flood threat to embankments during flood season, a river dredging engineering and comprehensive treatment program was proposed. The dredging scope of critical river in Liaohe was designated, five dredging sections of Liuhe-Kalima-Liujianfang-Panshan Dike-Shuguang Bridge and Shifosi Dam-Lujia Bridge were designed, and the dredging quantity was calculated and verified by overlapping the designed and the present sections. The total dredging length is 194.79 km, and the dredging quantity is 63.7×106 m3. Furthermore, the ecological man-agement to the embankments of Liaohe River was designed, which covers a shoreline length of 1 064 km, and an engineering length of 625.6 km. As a result, a comprehensive target was achieved by stabilizing the river and eliminating the critical risk levee sections.

     

/

返回文章
返回